We will be removing a gas fire and need to remove the flue and patch the space left in the Decramastic roof. Two-storey house, built mid-90s. Gas fire has been disconnected, next step is the roofing aspect ASAP before we can continue with the rest of the job
#1 | Tradie 1 |
|
127 jobs | No longer in contact |
#2 | Tradie 2 |
|
146 jobs | No longer in contact |
#3 | Tradie 3 |
|
351 jobs | No longer in contact |
Partner with Builderscrack
Get work