Some of the roof timber are weak, as mentioned by my structural engineer. The job needs to be done as per the report made by my structural engineer. The new supporting timber needed to be attached along with the weaker timber. Only 3 or 4 new timber needs to be attached in the weaker timber under the roof.
#1 | Tradie 1 |
|
80 jobs | No longer in contact |
#2 | Tradie 2 |
|
78 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work