We have an addition to our house that needs the spouting completed , It will join into the exsisting spouting , it will be about 40 meters with several corners. The house is fully scaffolded now so it will be an easy job The barge boards are painted and its good to go, I would like it done as soon as possable before it rains. We are happy to do the down pipes our selves after painting so we can fit the plastic tubing material for now to let the water run away untill we paint.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 10-04-2020
Partner with Builderscrack
Get work