Split level house, lower section requires a new colour steel roof installed and the previous corrugated iron removed. Install within the next 6 months (before June 2021). Likelihood that there will be some additional remedial work needed on the wooden frame as there are a couple of leaks.
#1 | Tradie 1 |
|
23 jobs | No longer in contact |
#2 | Tradie 2 |
|
46 jobs | No longer in contact |
#3 | Tradie 3 |
|
98 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 6 jobs | No longer in contact |
Partner with Builderscrack
Get work