I changed my hot water system to gas a couple of months ago and I need to get the header tank removed. This would mean taking off a sheet of long run iron off the roof and removing the header tank. Then I want to install another layer of batts to increase insulation. I can supply the batts.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
I had asked Dave to do an extra job for me which he did for an extra $30 ad I was happy with that.
Work carried out by the owner/operator
Reviewed on 19-08-2017
Partner with Builderscrack
Get work