Rip out old bathroom and reorganize layout and doors. Tiling from floor to ceiling if viable from a cost perspective. Budget around$15,000
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
3.0
|
Communications |
3.0
|
Work carried out by the owner/operator
Reviewed on 19-10-2021
Partner with Builderscrack
Get work