2 bathrooms to be gutted and replaced. Bathroom 1 is --- and requires relining of walls and ceiling, built in shower, floor and walls to be relined, waterproofed and tiled. Sliding door will be removed, new shower fittings, tapware, vanity and toilet to be installed. Configuration pretty much unchanged so don't expect any major plumbing challenges. Bathroom 2 is --- . Floor and walls to be relined, reconfiguring the bathroom layout. All walls to be tiled (floor to ceiling), new bath and over-bath shower + vanity + cabinet + toilet to be installed. All under-house plumbing is easily accessible.
#1 | Tradie 1 |
|
9 jobs | No longer in contact |
#2 | Tradie 2 |
|
13 jobs | No longer in contact |
#3 | Tradie 3 |
|
12 jobs | No longer in contact |
#4 | Tradie 4 |
|
23 jobs | No longer in contact |
#5 | Tradie 5 |
|
75 jobs | No longer in contact |
Partner with Builderscrack
Get work