Some consultation on initial design and concept. Replace bath. Replace toilet. Re-do walls. Address deterioration in floor at corner of bath (pictured). Some electrical work - Add extractor fan and replace heated towel rail.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
3.0
|
Communications |
4.0
|
Kuki and subcontractors were professional and pleasant to deal with. Job took a little longer than expected, due initially to delays in delivery of fittings (i.e. supply chain). Bathroom and toilet area now looking very new and tidy and far better than the old one. Got Kuki to do an additional job (laundry) - also good work and an out of sight improvement from the old arrangement.
Work carried out by the owner & subcontractors
Reviewed on 06-06-2021
#1 | Tradie 1 |
|
25 jobs | Secured job |
#2 | Tradie 2 |
|
12 jobs | No longer in contact |
#3 | Tradie 3 |
|
18 jobs | No longer in contact |