The bathroom is currently set up as a wet room but we would like to have the floor levelled and a free standing shower installed. It may be necessary to re-gib some of the wall and help with removing / placing the toilet back in after the new flooring is added. The job needs to be completed by the end of Feb 2021.
#1 | Tradie 1 |
|
33 jobs | No longer in contact |
#2 | Tradie 2 |
|
7 jobs | No longer in contact |
Partner with Builderscrack
Get work