Full kitchen replacement of cabinets and whiteware. Desired project start time is mid to late June All new kitchen cabinets will already be assembled and the old kitchen will have been removed Electrical work needed: * Disconnection and connection of a new hob and oven * Two additional power points added Plumbing work: * Connection of new sink to plumbing, and supporting a dishwasher being added * Potentially some work required with new extractor ducting Tiling work: * new backsplash and tiling trim around the kitchen walls Building work: * Installation of pre assembled units * Attaching the benches * Cutting the hole for the sink and installing it.