Review

Bathroom Renovation

Job image

Job description

Bathroom Renovation
Wellington

Hi there, Design is complete so now I need a builder / plumber / electrician and tiler to quote for the required work. The bathroom is on the smaller size (see attached existing bathroom) The new design will consist of a walk in tiled shower area with glass shield, wall hung vanity and heated towel rail. Lighting and power outlet also required. The existing walls behind existing vanity and bath area need to be replaced / fittings fixtures removed (plumbing and electrical), tiling completed, wiring for lighting & heated towel rail then all new fittings / fixtures installed thereafter. Maybe you're a builder that has your own other tradespeople i.e Plumber etc or maybe you go it alone .. whichever you are I am looking for one of each as above so please do get in touch asap. Ideally job can be done May and at the latest June. Look forward to hearing from you soon. Cheers, Katrina


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Cameron (Owner Operator of Burgess Building Ltd) was a pleasure to work with. Very personable and willing to go the extra mile from start to finish. Thanks Cameron and all the best. Katrina

Work carried out by the owner/operator
Reviewed on 22-10-2019

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo