Rough plans included to show desired layout/fixtures. Work required: -Remove and dispose of existing bathroom fixtures. (inc. Gib lining and lino flooring). - Re-line with bathroom gib and plaster. - Install new fixtures and fittings (we can source or provide a product list to be quoted) and move plumbing if where necessary. - Lay vinyl flooring - Upgrade cylinder to mains pressure. Not required in this quote: - Electrical work will be organised separately. - Painting Timeframe for work completion would be by end of April.
#1 | Tradie 1 | No recent reviews | 2 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 12 jobs | No longer in contact |
#3 | Tradie 3 |
|
25 jobs | No longer in contact |
#4 | Tradie 4 |
|
25 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 4 jobs | No longer in contact |
Partner with Builderscrack
Get work