1 existing bathroom renovated. 1 new ensuite to be created between 2 rooms. Rooms require re gibbing/plastering (not painting), new window installed. Consents and designs/drawings are completed. Would also like hallway re gibbed at the same time.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Outstanding workmanship and attention to detail. 110% satisfied. Would not hesitate to use again.
Work carried out by the owner/operator
Reviewed on 22-02-2018
Partner with Builderscrack
Get work