Closed job

308

Job image
Job image
Job image

Job description

Bathroom Renovation
Waitomo

Published: 5 January 2025

3 renovate shower jobs, will strip out and level ready for tiling, 1 at a time so that we have a functional shower working, starting with guest room picture 1 alcove, main bathroom picture 2 and lastly main bedroom. thinking pebble mosaic shower floors with large tiles walls. as seratone showers are falling apart they are urgent where the last is likely more complicated for us to prepare. first 2 are 900s last is 1.2x1 with seat and rail so it will last into our old age. this is part of a water system change from low to high, and revamping the whole main bathroom. whereas the others are more progressive. i will be pulling out the first in the next couple of weeks we have a tank coming 28th Jan and will likely have the plumber out then or shortly after to adjust shower head placement. cost is important but so is quality. I do a lot of DIY but desire a good quality finish. regards jacqui hahn


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo