Remove internal wall as shown in attachment (Slide 1) Replace 2 meter section of water damaged lower horizontal timber frame as shown in attachment (Slide 2) Hang 2 internal doors. (Slide 3). Inspect and repair gutters (Slide 4) Note all materials will be supplied
#1 | Tradie 1 |
|
24 jobs | No longer in contact |
#2 | Tradie 2 |
|
18 jobs | No longer in contact |
#3 | Tradie 3 |
|
26 jobs | No longer in contact |
#4 | Tradie 4 |
|
28 jobs | No longer in contact |
#5 | Tradie 5 |
|
7 jobs | No longer in contact |
Partner with Builderscrack
Get work