back door: create a transparent cover from backdoor to carport and close the gab between house and carport. Rain water will drain via existing carport rainwater down pipes. side door: transparent cover to be made partially over pergola so rain water doesn't come into living room when door gets opened. A solution for the rain water needs to be found. To be completed before 1st of March 2021. When starting the job to be completed in 1 go.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Good working with this company, well recommended.
Work carried out by the owner/operator
Reviewed on 28-02-2021
Partner with Builderscrack
Get work