Lino floored ensuite with plastic base shower cubicle, toilet and vanity. Install external door and internal opening. There is plumbing and hot water cylinder in the adjacent 'store' room. A new wastewater pipe will also need to be installed. Consented plan is attached. Please do a costs breakdown, additional work may include installing gib, gib stopping, painting, and installing laminate plank flooring in store room. Also path and deck to be added. We are in Titirangi if you are able to come and quote. We are currently applying for bank loan and then should be ready to proceed within the next month.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
Very happy with this company, they were polite, professional, timely, highly skilled and hardworking. There was some miscommunications around the quoted work however this was all resolved fairly. Highly recommended.
Work carried out by an employee of the company
Reviewed on 13-06-2022
Partner with Builderscrack
Get work