Installation of kitchen cabinets, draws, etc. Installation date between the 6th to the tenth is preferable to work around sparkies and plumbers.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 02-11-2019
Partner with Builderscrack
Get work