We are replacing an old kitchen with a Kaboodle kitchen which will arrive 18 September. Existing kitchen will have been removed and plan for the install is the week of 21 - 26 September. All cabinets and the bench top are new as well as oven, cook top and extractor fan. Existing fridge and dishwasher are being reused. Sizes are listed in the attachment. There is excellent drive on access to the house and kitchen. We require assembly and install of the kitchen. Thanks
Partner with Builderscrack
Get work