Remove existing shower (acrylic box type), toilet, vanity, and existing tile from floor. Build short piece of wall to create shower cavity. Tile floor and walls to ceiling, inculding tile shower, fit glass shower door Install new toilet, vanity and towel rail, toilet roll/handtowel holders.
#1 | Tradie 1 |
|
73 jobs | No longer in contact |
Partner with Builderscrack
Get work