Replied Levelled New sub floor where required Removal of wall/s Regibbing of full interior (we will paint) Insulation of walls Moving bathroom to existing laundry area Sort out borer issues Kitchen install Fireplace install as per pic using existing brick fireplace Address any leaks current or past and repair where required Replace rotten exterior boards Remove and install new wrap around deck Install new water tank and system for the house Install new gutter system. Water Bathroom Floors These are urgent and need addressing before Xmas. The rest can take 2020 to complete.
#1 | Tradie 1 |
|
8 jobs | No longer in contact |
Partner with Builderscrack
Get work