Gut out old bathroom. Break down walls between existing shower room, seperate toilet room and bathroom(3x rooms). Make one bathroom with new fittings and layout, vent and wall up the old doors. Ideally would like it done over a 2 month period.
#1 | Tradie 1 | No recent reviews | 26 jobs | No longer in contact |
#2 | Tradie 2 |
|
5 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 18 jobs | No longer in contact |
#4 | Tradie 4 |
|
18 jobs | No longer in contact |
#5 | Tradie 5 |
|
19 jobs | No longer in contact |
Partner with Builderscrack
Get work