Published: 30 November 2024
Full redo of bathroom. New ceiling and insulation done. Ventilation for water vapour. Retiling walls. Redesign of bathroom removal of bathtub and new shower installation. new floor done. New shower drain pipe and design. Modern bathroom look. Family bathroom. Separate toilet room.\||||
#1 | Tradie 1 |
|
37 jobs | No longer in contact |
#2 | Tradie 2 |
|
3 jobs | No longer in contact |
#3 | Tradie 3 |
|
54 jobs | No longer in contact |
#4 | Tradie 4 |
|
15 jobs | No longer in contact |
Partner with Builderscrack
Get work