1970s Lockwood with high pitch ceiling design, removal of non load bearing walls to make kitchen living area open plan. Installation of new wall to house fridge and wall oven and separate entrance hall from kitchen. Kitchen cabinets and installation being completed by kitchen installer. Replacement of sliding door to entrance hall with conventional hinged doors
Workmanship |
5.0
|
Cost |
3.0
|
Schedule |
5.0
|
Communications |
5.0
|
James was very easy to deal with and project managed as well as completed all of the build work to renovate our kitchen. The scope of work increased due to maintenance issues that had to be addressed during the construction work, and these were identified and scoped individually. The work was completed to a very high standard and attention to detail was very good. James listened to and addressed every aspect of the job no matter how small. We will be engaging JMC Build again for additional work.
Work carried out by the owner/operator
Reviewed on 04-07-2015