We have a KOHLER SPA BATH surrounded by tiling. We need to uplift the bath tub to enable the existing tiles to be removed and new ones put on. Once completed the bath tub will need to be relodged into the cavity and connected up to taps and power. Hence the taps also require to be temporarily removed and likewise the basin will need to be temporarily disconnected to enable the wall to be tiled and likewise the heated towel holder.
#1 | Tradie 1 |
|
344 jobs | No longer in contact |
#2 | Tradie 2 |
|
4 jobs | No longer in contact |
Partner with Builderscrack
Get work