Active job

Small kitchen renovation

Job image
Job image
Job image
Job image

Job description

Kitchen Renovation
Rodney

Looking at installing two base kitchen cabinets and new microwave wall cabinet end fillers, back panels and kickboards (additions to existing kitchen cabinets). New cabinets are already assembled but require levelling to height of existing cabinets prior to new stone bench top/island being installed by supplier. End panels ad fillers (supplied) to be installed for new cabinets and also for diswasher and washing machine as new benchtop fitted over this. Timeframe ideally within 2 weeks


Trade professionals

#1 Tradie 1 No recent reviews 43 jobs No longer in contact
#2 Tradie 2 No recent reviews 15 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo