Replacing tiles on the walls and the floor, fitting a new shower, toilets and a hand basin all in the original locations. Looking to buy all the necessary materials myself and for you to provide the work (unless we can work out something else). Looking to have it finished before February with an option to do the master bathroom as well if happy with results.
#1 | Tradie 1 |
|
14 jobs | No longer in contact |
#2 | Tradie 2 |
|
77 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 0 jobs | No longer in contact |
#4 | Tradie 4 |
|
70 jobs | No longer in contact |
#5 | Tradie 5 |
|
37 jobs | No longer in contact |
#6 | Tradie 6 |
|
559 jobs | No longer in contact |
Partner with Builderscrack
Get work