A real basic job adding a door as big as will fit and a wall above to the raked ceiling so to enclose study. painting not required. this is real minor but must be done in the weekdays starting april 23. other handyman type things need doing as well, but needs a site visit. 1/34 elizabeth street orewa
#1 | Tradie 1 | No recent reviews | 1 job | No longer in contact |
#2 | Tradie 2 | No recent reviews | 3 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 28 jobs | No longer in contact |
Partner with Builderscrack
Get work