Totally gut the bathroom. Remove wall between bathroom and toilet. Take out toilet door and replace with a wall. Remove bath and old basin replace with vanity and .basin and shower. Toilet to be repositioned Walls and part of ceiling to be replaced. Put vinyl on bathroom and toilet floors. Expelair or similar to be installed
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
I Highly recommend James from Enock Construction. Very good communication and total bathroom renovation completed on time. I now have a beautiful bathroom.
Work carried out by the owner & subcontractors
Reviewed on 05-03-2019
Partner with Builderscrack
Get work