We have a bath with a shower above. The bath needs replacing and the glass shower doors would need to be reset as well as retiling the bath surround. It is possible that some repair to the floor beneath the bath might be required. We would source the bath but might appreciate some advice.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
5.0
|
Accurate quote. Good communication. Really easy to work with
Work carried out by the owner/operator
Reviewed on 17-10-2018
Partner with Builderscrack
Get work