Continue wall to wall off shower area, install sliding door. Install shower and sink. Replace large window with french doors. The sleepout is a concrete slab foundation. There is a toilet and sink - so there is some existing plumbing in the sleepout. We are flexible with timeframe, and sleepout isn't used currently.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
5.0
|
Really enjoyed working with Ron, great communication and bathroom looks great. Will contact him about any future work we have.
Work carried out by the owner/operator
Reviewed on 25-11-2020
Partner with Builderscrack
Get work