Painting and possibly some wallpaper of 4 bedroom home. Cupboard to be adapted to fit fridge (power socket needed). Possible repaint kitchen cabinets if possible. Dispose of ceiling fan and put up new light fixture.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
2.0
|
Builders quality of work was to a high standard. But had to follow up on two other areas (plug point left and plaster job not to a high standard). Overall after areas were fixed we were happy with the result. But we did have to initiate communication alot ourselves.
Work carried out by the owner & subcontractors
Reviewed on 24-07-2019
Partner with Builderscrack
Get work