The bathroom is 2.6m x 1.7m with tiled floor and underfloor heating. Works required: 1. Remove all floor tiles and shower 2. Repair section of flooring under tiles (approx 1msq particle board and plywood) which has been damaged by a leak possibly from the shower. Joists are unaffected by the leak. 3. Install new shower (to be supplied) 4. Tile floor (tiles to be supplied)