Removing the entire shower and surrounding fittings. Remove tiles and underlay to cut the floor and replace with a new timber floor. Replace walls behind shower with new gib and then replace tile underlay, waterproof floor and tiling of floor.Refit vanity and shower, with a plastering and painting to finish.
#1 | Tradie 1 |
|
16 jobs | No longer in contact |
#2 | Tradie 2 |
|
333 jobs | No longer in contact |
#3 | Tradie 3 |
|
39 jobs | No longer in contact |
#4 | Tradie 4 |
|
24 jobs | No longer in contact |
#5 | Tradie 5 |
|
36 jobs | No longer in contact |
#6 | Tradie 6 |
|
10 jobs | No longer in contact |
#7 | Tradie 7 |
|
7 jobs | No longer in contact |
#8 | Tradie 8 |
|
73 jobs | No longer in contact |
Partner with Builderscrack
Get work