Our existing bathroom has no bath - there is only a walk-in shower and a vanity in it. We want to: * remove the existing walk-in shower, remove the vinyl floor and level the drop off from the walk-in shower * remove the vanity and remove tiles from one wall * remove 2 existing heated towel rails * install and plumb a new bath, shower cubicle and vanity (supplied) * install the taps and mixers (supplied) * fix and prep walls for painting (we will paint) * reinstall a tiled floor ( bathroom size is 2m x 2,3m) * we will install towel rails etc afterwards. * all rubble to be be removed.
#1 | Tradie 1 |
|
29 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 29 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 56 jobs | No longer in contact |
#4 | Tradie 4 |
|
20 jobs | No longer in contact |
#5 | Tradie 5 |
|
73 jobs | No longer in contact |
#6 | Tradie 6 |
|
19 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 52 jobs | No longer in contact |
#8 | Tradie 8 | No recent reviews | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work