Remove shub. Re-line shower and install fixed shower screen/door. Replace existing vanity. Re-tile walls and floor. Re-tile toilet floor to match new bathroom floor tiles ( existing wall hung toilet NOT needing replacement). Would like job completed before Christmas.
#1 | Tradie 1 |
|
31 jobs | No longer in contact |
#2 | Tradie 2 |
|
73 jobs | No longer in contact |
#3 | Tradie 3 | Not reviewed | 0 jobs | No longer in contact |
#4 | Tradie 4 |
|
19 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 4 jobs | No longer in contact |
Partner with Builderscrack
Get work