Active job

New Bathroom Renovation

Job description

New Bathroom
North Shore

wanting to build bathroom/laundry using the space currently housing one toilet and one shower and hall space. back wall is approx 1m block, rest is gib Toilet and existing shower to be removed, wall between two to come down. New toilet to be installed, new shower to be installed - will need to sit raised as it sits on a tiled concrete slab. Framing and wall to go up to close area off and create one large room. could potentially use an existing door but would like to look at the possibility of a cavity slider. vanity/laundry tub and plumbing for washing machine to be installed. All new fixtures and fittings no current timeline for work, ideally within the next 6 months.


Trade professionals

#1 Tradie 1
39 jobs No longer in contact
#2 Tradie 2
8 jobs No longer in contact
#3 Tradie 3
73 jobs No longer in contact
#4 Tradie 4 No recent reviews 3 jobs No longer in contact
#5 Tradie 5
7 jobs No longer in contact
#6 Tradie 6 No recent reviews 7 jobs No longer in contact
#7 Tradie 7
23 jobs No longer in contact
#8 Tradie 8
9 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo