Review

Bathroom renovation

Job image
Job image

Job description

Bathroom Renovation
North Shore

Remove and dispose wall and floor tiles. Remove and dispose plasterboard wall linings if damaged in removing wall tiles, Install new plasterboard wall linings if required, (approx 15 m2) Install new wall and floor tiles. (approx 10 m2) Paint walls and ceiling and one side of door, (approx 20 m2) Install new ring towel rail. Remove existing WC and vanity basin, Install new WC and vanity basin Install new downlight in ceiling Carefully remove existing mirror and refix,


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo