Complete bathroom renovation: gas fitter to change to Natural Gas system - from existing electric hot water cylinder. Shorten hot water cylinder cupboard to maximise bathroom space. remove existing fittings, fixtures, tiles etc. Need to retile and fit with new fixtures (inc glass shower, vanity, etc). Photos attached inc floor plan. To be completed in July (limited by tenancy termination)
#1 | Tradie 1 |
|
54 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 31 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 9 jobs | No longer in contact |
#4 | Tradie 4 |
|
66 jobs | No longer in contact |
#5 | Tradie 5 |
|
18 jobs | No longer in contact |
#6 | Tradie 6 |
|
34 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 4 jobs | No longer in contact |
#8 | Tradie 8 | No recent reviews | 9 jobs | No longer in contact |
Partner with Builderscrack
Get work