Complete bathroom rebuild. Existing bathroom will be completely stripped. New Floor likely required. Tiled floor with underfloor heating. Two walls to be half tiled. Square stopped. Free standing bath, acrylic angled shower, wall hung vanity and new toilet. Rimu trim around the windows and rimu skirting boards to be retained.
#1 | Tradie 1 |
|
1 job | No longer in contact |
#2 | Tradie 2 |
|
47 jobs | No longer in contact |
#3 | Tradie 3 |
|
7 jobs | No longer in contact |
Partner with Builderscrack
Get work