Full strip out of bathroom. Installation of: *new ceiling *walls *new shower over bath at opposite end of where it is placed now with a glass door. *New wall hung vanity *Replace bottom wood of window *Install cavity door. *Extractor fan *vinyl flooring *Towel rails and mirror etc *painting and plastering. We would like someone that is able to do the painting and plastering aswell and ideally someone that organizes the electrician and plumber to come in when they are ready so there is no waiting on other tradies to continue the build. Have been told about a week and a half time frame to complete, so someone who can match that or less
#1 | Tradie 1 |
|
50 jobs | No longer in contact |
Partner with Builderscrack
Get work