Closed job

bathroom Reno

Job image
Job image
Job image
Job image
Job image
Job image
Job image
Job image
Job image

Job description

Bathroom Renovation
Napier

Walls must be redone in Seratone. All of them, ceiling to floor. Currently a (Badly done) wet floor, done 17 yrs ago. Have new vanity (with tap and waste) to go in, shower mixer and slide is also new (Methven) and can be reused. This is not any DIY idea, this is to help keep costs down. The new vanity was donated by relative at bathroom factory. It's 900mm, 2 door, 3 drawer, your standard type, with sink, tap (Methven) and popup waste. Floor needs to come up and not be redone as wet floor, shower cubicle is probably cheapest option. Shower is currently at door end so probably no good there, vanity is at window end. Move them the other way round? It is a small space, it would be nice to knock through into toilet but I suspect that is beyond the budget. It looks better than it really is, cause I painted the entire thing, vanity, walls, ceiling, mould is coming through paint again though. Budget is limited not by choice, by how much I have in bank.


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo