Remove 2x partition walls Move doorway Remove existing built in bath structure Rejib walls and ceiling as required Fill gaps in timber floor created Install shower cubicle
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
5.0
|
Completed creation of a bathroom from three smaller rooms, organised whole job, and finished of painting and plastering. Work was done as described, with good regular communication. Disruption and dirt was minimised, and the finishes are excellent. Delivered what was wanted at a good price. Couldnt have asked for more.
Work carried out by the owner/operator
Reviewed on 02-08-2021
Tradesperson reply
"Thanks for the positive review. I'm glad you're happy with the end result."
Partner with Builderscrack
Get work