Hi, I have a 70s bathroom in need of renovation. Shower update is the priority. Stage 1: replace crappy corner shower ASAP - not sure whether to tile or install complete corner unit. Shower tray sits approx 200mm off floor - centre waste. As this is a holiday home, viewings and job will need to work around bookings. (Stage 2: update toilet and vanity - timeframe approx end Feb. Stage 3: update flooring, options and quote for tiled floor with underfloor heating. Timeframe approx end March.) Happy to discuss the above - Cheers Donna
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
3.0
|
I cannot fault the quality of workmanship. Written quote should have been requested by me as the cost was way above expectation - that said, the job was completed to a very high standard
Work carried out by the owner/operator