Published: 16 July 2024
This job involves renovating: - a separate toilet area and - bathroom. I am looking for someone to project manage the renovation including organising and co-ordinating with all trades (e.g. builder, plumber, electrician, tiler, plasterer, painter etc). Ideally one of these trades noted will take on this role. I am looking for one combined quote covering all the work required to renovate these two spaces including: • Removal and disposal of existing fixtures and fittings • Installation of upgraded fixtures and fittings • Removing existing vinyl flooring • Installing 600x600mm floor tiles (toilet / bathroom) and walls (bathroom) • Gib (if required), plastering and painting • Electrical work Toilet Scope of work: No changes to toilet layout – new fittings to be located in the same area as existing fittings Floor area = 210cm long by 103cm wide Replace existing toilet with back to wall model Replace existing vanity with new vanity Replace existing downlight with recessed LED ceiling light Tile floor (2.2m2) Paint walls and ceiling (walls have been mostly prepped and an undercoat applied) Skirting boards (reuse or replace) Bathroom scope of work: No change to bathroom layout – new fittings to be located in same area as existing fittings. The bath outlet may need to be chased to a different location in the concrete floor. Room size: 305cm long by 200cm wide Replace existing bath / install new bath (1500 x 800 x 600) and mixer Replace existing vanity / install new vanity (900mm) and mixer Replace existing heating towel rail / install new heated towel rail Replace existing mirror / install LED demister mirror Remove existing wall heater (No replacement) Shower – no changes Install underfloor heating (DEVI heat mat system) Tile floor (5.1m2) Tile all walls; regarding shower area = area above shower cubicle (approx. 16m2) Gib (aqualine around bath approx 5.6m2 if required) / plaster walls (as required) Skirting boards; reuse or replace Paint walls and ceiling – (Existing ceiling light fitting and extraction fan are staying) No change to shower Photos: Photo 1 = Toilet Photo 2 = Bathroom; vanity area Photo 3 = Bathroom; shower area (no changes to the built in shower or fittings) Photo 4 = Bathroom; Bath area Photo 5 = Details of fixtures and fittings Other: The home is 30 years old (build in 1994), single level on concrete foundations.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Tony and his contractors renovated a separate toilet and bathroom (the bathroom was fully tiled, underfloor heating installed, 50% of the gib replaced and all fixtures, excluding the shower, were updated). The whole project took just over a month. There were a couple of issues which Tony proactively responded to and addressed promptly. I have no hesitation recommending Tony and I would engage him and his team in future if the need arose.
Work carried out by the owner & subcontractors
Reviewed on 16-10-2024
Partner with Builderscrack
Get work