Windows 1&2 to be replaced with double glazing removing the arches. Windows 3 & 5 to be removed and reclad. Windows 4 & 6 to be replaced with double glazing. Other renovation work such as the deck railing to be renewed. There is a wall to be built in the garage.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
I’m very pleased with the small porch Paul built.
Work carried out by the owner/operator
Reviewed on 07-12-2018
Partner with Builderscrack
Get work