I have a half completed bathroom, I need the vanity hung and plumbing connected. I have been advised it may need a false wall constructed to hang the vanity from. I also need villaboard placed on the floor for tiling.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 08-02-2021
Partner with Builderscrack
Get work