The bath and toilet need to be removed and replaced. All lining around bath needs to be taken down and replaced. New taps / shower fixture New cabinet. There has been a leak so I suspect this will add to cost but as always, won't know until the lining is taken down. I can prepurchase the bath, toilet and cabinet and it can be there ready to be put in once the lining etc has been replaced. I'd like to have someone to come and talk to me first or ring and then we can look to book the date for 1st or 2nd Sept.
Partner with Builderscrack
Get work