Renovating kitchen, need a couple of internal windows removed and framed up, need a bulkhead and wall containing a cavity slider installed (not load bearing) there is also a skylight that we are wanting to frame out, not being removed from roof though just want it covered up internally. will need plasterer to stop etc. Need to have this completed at the latest by the 5th April for kitchen install. plumber/gasfitter also needed to move gas and plumbing to suit new kitchen design (great access to underneath house) all cabinetry/joinery for kitchen is organised already and we have plans to make it a bit easier too.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Would definitely recommend fieldworx, great job.
Work carried out by the owner/operator
Reviewed on 18-02-2019
Partner with Builderscrack
Get work