10m2 bathroom, water damaged chip board flooring removed and flooring replaced, new shower installed. Bath needs to be removed then put back when flooring replaced. Plumbing and vinyl installation required.
#1 | Tradie 1 |
|
21 jobs | No longer in contact |
Partner with Builderscrack
Get work